Viewing Reporting Charts

Cedato -

Measures

The top of Cedato reports shows a chart that graphically represents the measures of the Supply or Demand items selected in the report – per hour or per day.

mceclip0.png

A different tab is provided for each measure, such as Revenue, Opportunities, Ad Requests, Impressions, Fill Rate, RPM, Impression RPM and Cost, as shown above. Simply click the relevant tab to display each chart.

Graph Lines

A single graph line appears when more than 5 Supply or Demand items are selected in the report. Supply or Demand items are selected by checking the Viewing_Charts-2.png checkbox on the left of each row. If 5 or less Supply or Demand items checkboxes (Viewing_Charts-3.png) are selected, then each is shown as a different colored graph line. For example, as shown below –

mceclip1.png

If the chart is taking up too much space and there is no need to display the trend, you can simply shrink it by clicking the arrow shown below –

mceclip2.png

You can click the arrow again to re-expand.

Time Frame

The time frame of a report is displayed according to the selection in Viewing_Charts-6.png. Simply click on it to select a new time range if needed –

Viewing_Charts-7.png

Data Point Values

To see the exact value of each data point, simply hover over it, as shown below –

Viewing_Charts-8.png

Time Zone

The time zone of the chart can be controlled using Viewing_Charts-9.png, which appears in the top right of the window.

Viewing_Charts-10.png

Changing the time zone only affects the report in which you modify it. These time zone settings are saved on the browser/computer.

The Cedato activity log continues to work according to EST. Cedato legacy reports always operate according to EST, even if you change the time zone here.

Have more questions? Submit a request

0 Comments

Article is closed for comments.